Proposed FWPS State Match Funded Projects

With the approximately $20 million in State Match funds triggered by the passage of the May 15, 2007, bond measure, the district will be able to provide:

  • Roof repairs or replacements to eleven elementary schools - Adelaide, Brigadoon, Camelot, Green Gables, Lake Dolloff, Lake Grove, Mark Twain, Nautilus, Rainier View, Twin Lakes, and Wildwood.  Sacajawea and Totem Middle Schools, and Decatur High School are also slated for new roofs.
  • New heating systems or new controls for nine elementary schools – Brigadoon, Camelot, Lake Dolloff, Mirror Lake, Nautilus, Star Lake, Twin Lakes, Wildwood, and Woodmont.  Sacajawea and Totem Middle Schools and Thomas Jefferson High School are also on this list.
  • Plumbing upgrades, specifically replacing domestic water systems or connect to gravity sewer systems, at Adelaide, Brigadoon, Lake Grove, and Twin Lakes Elementary Schools and Illahee Middle School.
  • Electrical work, replacing or adding capacity to the electrical distribution systems at Adelaide, Nautilus, and Star Lake Elementary Schools and Totem Middle School.
  • Structural work, specifically additional earthquake reinforcement, at Adelaide, Lake Grove, Mark Twain, Mirror Lake, Olympic View, Twin Lakes, Wildwood, and Woodmont elementary schools, as well as Sacajawea and Totem Middle Schools, Decatur HS, and Memorial Field.   Thomas Jefferson will get new floor system.
  • Replace interior lighting systems at Adelaide, Brigadoon, Lake Dolloff, Mirror Lake, Rainier View, Silver Lake, Star Lake, Twin Lakes, and Woodmont Elementary Schools and Thomas Jefferson High School.  Memorial Field will receive a new field lighting system.
  • Improve parking safety and capacity at Mirror Lake, Olympic View, Twin Lakes, and Woodmont Elementary Schools, Decatur High School and Memorial Field.
  • Replace siding at Brigadoon and Nautilus.
  • Replace existing cinder fields with turf at Brigadoon, Lake Grove, Nautilus, Olympic View, Star Lake, Twin Lakes, Wildwood and Woodmont elementary schools, and all middle schools except Lakota and Sequoyah. Decatur’s track surface will be replaced.  Thomas Jefferson will complete track improvements and replace the turf playing surface with all-weather surface.

(2006 RECOMMENDATION)
Bond Qualified Building Improvement Projects

 

ROOF

HEAT

STRUCTURE

PLUMBING

ELECTRICAL

LIGHTING

PARKING

FIELDS

ENCLOSURE

ACCESS

ADELAIDE

X

 

X

X

X

X

 

 

 

 

BRIGADOON

X

X

 

X

 

X

 

X

X

 

CAMELOT

X

X

 

 

 

 

 

 

 

 

GREEN GABLES

X

 

 

 

 

 

 

 

 

 

LAKE DOLLOFF

X

X

 

 

 

X

 

 

 

 

LAKE GROVE

X

 

X

X

 

 

 

X

 

 

MARK TWAIN

X

 

X

 

 

 

 

 

 

 

MIRROR LAKE

 

X

X

 

 

X

X

 

 

 

NAUTILUS

X

X

 

 

X

 

 

X

X

 

OLYMPIC VIEW

 

 

X

 

 

 

X

X

 

 

RAINIER VIEW

X

 

 

 

 

X

 

 

 

 

SILVER LAKE

 

 

 

 

 

X

 

 

 

 

STAR LAKE

 

X

 

 

X

X

 

X

 

 

TWIN LAKES

X

X

X

X

 

X

X

X

 

 

WILDWOOD

X

X

X

 

 

 

 

X

 

 

WOODMONT

 

X

X

 

 

X

X

X

 

 

 

 

 

 

 

 

 

 

 

 

 

ILLAHEE

 

 

 

X

 

 

 

X

 

 

KILO

 

 

 

 

 

 

 

X

 

 

SACAJAWEA

X

X

X

 

 

 

 

X

 

 

SAGHALIE

 

 

 

 

 

 

 

X

 

 

TOTEM

X

X

X

 

X

 

 

X

 

 

DECATUR

X

 

X

 

 

 

X

X

 

 

THOMAS JEFFERSON

 

X

X

 

 

X

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

MEMORIAL FIELD

 

 

X

 

 

X

X

X

 

X

 

GENERAL PROJECT DEFINITIONS

HEAT                          New system and, or controls

STRUCTURAL           Additional earthquake resistance
                                    TJHS New floor system

PLUMBING                Replace domestic water systems or
                                    Connect to gravity sewer system

ELECTRICAL Replace or add capacity to electrical distribution system

LIGHTING                  Replace interior lighting system
                                    FWMF replace field lighting system

PARKING                   Improve parking safety and capacity

FIELDS                       Replace existing cinder fields with turf or
                                    TJHS complete track improvements and replace turf playing surface with all-weather surface
                                    DHS Replace entire track surface
                                    FWMF Replace track and field surfaces

ENCLOSURE             Replace failed siding material

ACCESS                     Add access accommodations to the entire FWMF facility

 

TOTAL COST ALL PROJECTS        $19,950,000